WhatsApp: +86 133 0533 1978

Installing a Bricking Machine – Step-by-Step Guide

Watch how a QZJ bricking machine is assembled and installed inside a rotary kiln. From positioning the arch and trolley to locking the double-arch structure and setting up the work platform, this step-by-step video shows the entire process.

Installation at a Glance

  • Prepare the kiln – clean the shell and verify the kiln diameter before assembling the machine.
  • Assemble the arch – position the arch components and fix them with the pin shaft system for a stable double-arch structure.
  • Mount the trolley – install the trolley on the rails and secure the braking pulleys with anti-derailing devices.
  • Connect pneumatics – link the air filter unit, master valves and pneumatic cylinders; check air pressure of 90–120 psi.
  • Load and verify – load bricks, test the safety check valve, and confirm the platform moves parallel to the kiln axis.

With an experienced crew, the modular pin assembly system enables setup in under 2 hours.

Need Installation Support?

Our team provides on-site installation guidance and operator training with every machine.

Contact the Export Team

Product Overview

See the full QZJ series bricking lining machines for kilns from 1.8 m to 6 m.

Browse Products →

Download Brochure

Request detailed PDF brochures for the QZJ2.5KT-1, QZJ5KT-1 and QZJ10KT-1.

Request Brochure